DIRECTIONS:
Refer to flooring
manufacturers specific recommendations. Condition
the area to be installed, adhesive and flooring at
65°F (18°C) or above for 48 hours before,
during and 48 hours after installation. Floor must
be sound, smooth, dry, clean and free of excessive
moisture or alkali. Remove dirt, wax, loose paint
and all other foreign matter that would interfere
with a good bond such as curing agents and sealers.
- Stir any liquid on
the surface into the adhesive.
- Full spread adhesive
using recommended trowel.
- Before installing
solid vinyl tile, allow adhesive to set open until
dry to the touch (tacky but no transfer to fingers),
approximately 45-60 minutes. Before installing wood
parquet, allow adhesive to start to develop some
tack, approximately 30-60 minutes.
- After appropriate
open time, install floor. Within 8 hours, cut and
fit as recommended by the the flooring manufacturer.
- Roll vinyl tile with
a 125-150 lb roller and wood parquet with a 100-125
lb roller, if recommended by the flooring manufacturer.
- Do not walk on wood
parquet for 24 hours after installation.
- Do not wet wash or
strip floor for 5 days after installation.
|
Application
|
Recommended
Trowel
|
Coverage
|
| Solid
Vinyl Tile |
|

200-250 sq. ft.
(22-28 sq yds/gal)
|
| Wood
Parquet |
|

60-65 sq. ft.
(6-8 sq yds/gal)
|
Click on the icons above to
calculate the amount of product you need!
CLEANUP:
- Wet
Adhesive: Clean, white cloth dampened with soapy
water.
- Dried
Adhesive: Clean, white cloth dampened with mineral
spirits; carefully following warnings on the container.
WARNINGS:
Carefully read and follow all cautions and warnings
on the product label. Refer to the Material
Safety Data Sheet for additional product information.
|