|
DIRECTIONS:
Refer to flooring manufacturers
specific recommendations. Condition the area to be
installed, adhesive, primer, and flooring at 65°F
(18°C) or above for 48 hours before, during and
48 hours after installation. Floor must be sound,
smooth, dry, clean and free of excessive moisture
or alkali. Remove dirt, wax, polish, paint and all
other foreign matter that would interfere with a good
bond such as curing agents and sealers.
- Apply
with a short nap paint roller or a coarse fiber brush.
Do not allow puddles to form or remain on the surface.
- Use
full strength.
- Allow
to dry completely, approximately 30 minutes or more.
COVERAGE:
Applied
with brush or roller, 300-450 sq ft (33-50 sq yds)/gallon.
CLEANUP:
- Clean
tools with water before material dries
WARNINGS:
Carefully read and follow all cautions and warnings
on the product label. Refer to the Material
Safety Data Sheet for additional product information.
|